COTTON CANVAS TWO TONE SHOPPER – C'est La Vie Online

🚨 2024 Orders Close 8 December! 🚨 All orders placed now until 8 Dec will dispatch on 20 Dec. ⚠️ NO RUSH ORDERS WILL BE ACCOMMODATED!

COTTON CANVAS TWO TONE SHOPPER
COTTON CANVAS TWO TONE SHOPPER

COTTON CANVAS TWO TONE SHOPPER

Regular price
R 200.00
Sale price
R 200.00
Tax included. Shipping calculated at checkout.

PRODUCT INFORMATION:

This strong and durable all-purpose tote bag is made from natural cotton. Suitable as a conference or event bag, it will also be right at home on the beach, in the shops, or as your every-day carry bag. 
  • 44 ( l ) x 13.5 ( w ) x 37 ( h ) cm
  • 100% cotton
  • long, coloured cotton webbing handles
  • strong, durable 220g/m2 cotton canvas fabric
  • coloured bottom panel

BRANDING METHOD:

  • Chosen Branding Method: DTF (Direct to Film Printing)

    • Designs are printed directly onto a specialized film.
    • The printed design is then pressed onto fiber fabrics using heat.
  • Design Versatility:

    • DTF printing offers a broad spectrum of design possibilities.
    • Explore a diverse range of options in terms of designs and colors.
  • Lasting Print:

    • The DTF process ensures a lasting print.
    • It seamlessly integrates with the fibers of the product.

Immerse your customized products in the expansive design options and lasting impressions achieved through DTF printing.

DTF Printing explained:

DTF (Direct to Film) printing is a method where designs are directly printed onto a special film using UV curable inks. The printed design is then transferred to fabrics using heat, resulting in vibrant and durable prints. This process guarantees precise and detailed designs on fabric surfaces, making it a popular choice for diverse textile applications.

Washing Instructions: To preserve the quality of your DTF-printed fabrics, follow these guidelines:

  • Wash with mild detergent.
  • Use cold water for gentle cleaning.
  • Avoid harsh chemicals or bleach.
  • Air-dry or use a low-heat setting when machine drying.

    ORDER LEAD TIME:

    JAN-OCT:

    • Design lead time: 3-5 working days after payment confirmation.
    • Production lead time: 5-10 working days after artwork approval.
    • Safe lead time indication: 10-15 working days from payment confirmation.

    NOV-DEC:

    • Design lead time: 5-7 working days after payment confirmation.
    • Production lead time: 10-15 working days after artwork approval.
    • Safe lead time indication: 15-20 working days from payment confirmation.

    While we aim to fulfill orders promptly and sometimes dispatch before the indicated lead times, certain factors influence our operational capabilities. The specified lead times are in place to accommodate various daily factors that may impact our production process.

    DESIGN:

    • We welcome any custom design of your choice in conjunction with the mentioned branding method.
    • Our policy strictly prohibits copying or replicating other designers' work.
    • Your reference image will be used solely as a reference, and a unique design will be crafted for your product.

    BULK PRICING:

    TERMS AND CONDITIONS:

    • Read our Terms and Conditions here.
    • By proceeding with the order, we assume the client has read and understands the T's and C's